EI Transformer for Parking Management System EI Transformer for Parking Management System

POWER: 1000VA
Input: 380V Output: 220V
Insulation systems: 130/155/180 degree are available.
Design to meet UL/CSA/TUV/VDE/CE and other safety requirements.
ROHS 2.0 Directive and (SVHC/REACH) are conformity.
Application field: Jacking System

Share this:

Key Specifications

Parking Management system transformer is also named as Jacking system transformer. It is an AC voltage converting device. Usually use it to conver the network voltage into genearl output voltage. For example, 400V in to 220V out, 380V in to 220Vout, 220V in to 110V out. The transformes should be low instantaneous start current, no static current sound, no vibration and sufficient instantaneous power.

 

Product Feature:
1. The tranformer has wiring terminal, it is very easy to install.
2. Low loss and low noise.
3. It is made with high permeability silicon steel and high quality copper wire.
    And it can be made with temperature proector to ensure the safe operation of the transformer.
4. Can design accorinding to customer's working environment and working space.


Power Range: 50VA to 20KVA

Phase: Single

Input/Output: Customized

Insulation: up to 4kV (Hi-pot)


Sample Lead Time: 3~5 days
 Production Lead Time:3 Weeks  (Urgent order can be negotiated)
 Quantity:No MOQ Require
 

Specification Table

Power Regulation Temperature
Rise
Size(mm)
L W H A×B
BK-50VA 9.0% 60 78 75 90 56x55
BK-100VA 8.0% 60 78 81 90 56x61
BK-150VA 6.5% 60 88 92 95 64×71
BK-200VA 6.4% 65℃ 97 98 105 76×71
BK-250VA 4.8% 65 105 105 91 84×77
BK-300VA 4.6% 65 105 110 91 84×82
BK-400VA 4.5% 65 115 115 120 90×86
BK-500VA 4.4% 65 115 120 120 95×86
BK-600VA 4.1% 65℃ 133 117 138 110×83
BK-800VA 3.8% 65 133 132 138 110×98
BK-1KVA 3.5% 65 153 133 159 110×93
BK-1.2KVA 3.4% 65 153 138 159 110×98
BK-1.5KVA 3.3% 65 163 185 185 135×107
BK-2.0KVA 3.1% 70 163 210 185 135×132
BK-3KVA 2.6% 70 194 232 215 160×132
BK-5KVA 2.2% 70℃ 230 235 250 190×135
BK-7KVA 2.1% 70℃ 230 255 250 190×155
BK-10KVA 2.0% 75 230 315 250 190×185
BK-12KVA 1.9% 75 242 300 275 200×188
BK-15KVA 1.8% 75 275 315 275 225×185
BK-20KVA 1.5% 75 310 310 310 254×185
 


                  
           

Process

EI Transformer Main Materials (IQC process)

All the material is inspected strictly with ISO9001:2015 quality program.

Core: appearance inspection and core loss test.

Copper wire: pinhole test and coat of adhesion test

 

 EI  Transformer Process

  • EI lamination has 0.35mm and 0.5mm thickness, material has Z11/H12/H14/H18/H50 of option.
  • The insulation for coil has 0.075/0.125mm thickness polyster film. 0.18/0.25mm DMD insulation paper and T410 Nomex paper. The brand of polyster film is DUPONT. The layers of overlap is deponds on the safety agent requirements.
  • Primary and Secondary winding wire is polyesterimid enameled, have 130/155/180/200degree for option.
  • Primary lead wire from type UL1617 double insulation for 600V voltage and 105 degree or UL3321 XLPE for 600V and 150degree.
  • Secondary lead wire from type UL1015 for 600V voltage and 105 degree.
  • Outer insulation is overlap 1 layer 0.075/0.125mm thickness polyester film or 0.18/0.25mm DMD insulation paper or T410 Nomex paper.

 

EI  Transformer Testing Items

  • Exciting current & core loss: 100% test
  • DC Resistance: 100% test
  • Layer insulation: 100% test
  • Loading test: 100% test
  • Hi-pot test: 100% test, but the time is only approx 10seconds for the production-run.
  • Aging test: Spot check, 10% of product quantity

 

FAQ

×

Inquire

*Name
*Email
Company Name
Tel
*Message
×

Contact Us

captcha